This project was built using the KPN contract with JT Sauer and Associates as the architect. The grandstand was “turn key” from the foundations up. Square tube columns were used on “B” line so that cross bracing wasn’t needed. This was a challenging project as the building site was very tight. Setting the press box a real challenge with the existing building so close behind the structure.
Doing this project with Stadium Solutions and GT Grandstands using the KPN contract not only saved us money but expedited the process. Thank you for a job well done.
– Dr. Robert Postupac, Superintendent Blackhawk School District